Sandbox · Grid Storage Model · Premise Onboarding

Premise Onboarding

Register a new metered premise for the grid-storage model — identification, address, electrical envelope, and tariff classification. Field labels are the source columns from the utility extract.

Identification

Step 01 · 04
Utility-issued meter serial. Numeric.
Premise / account number on the electricity bill.
Where the meter / device is physically installed on the premise.

Address

Step 02 · 04
Street name with house number where applicable.

Electrical envelope

Step 03 · 04
kW
Contracted grid connection capacity (utility ceiling for import / export).
kW
Nameplate of generation (PV / other) already installed at the premise.
MWh
Battery energy capacity to be commissioned on this meter.
h/yr
Cap on curtailment hours the operator may invoke in a calendar year.

Classification & tariff

Step 04 · 04
Building / site classification used by the utility.
Commercial arrangement between premise and utility.
Utility-internal operational status / regime code.
Identifier of the production unit this premise belongs to.
Tariff uplift for premises inside a designated urban zone.
Draft — no fields submitted.
JSON copied to clipboard